25234.
(a) As a condition of receiving state funding to deploy a publicly available electric vehicle charging station, the recipient of the state funding shall agree to operate the station in compliance with the reliability and reporting standards developed by the commission pursuant to subdivision (b).(b) For purposes of subdivision (a), the commission shall develop reliability and reporting standards for the operation of publicly available electric vehicle charging stations, including all
both of the following:
(1) Uptime requirements.
(2) Operation and maintenance plan requirements.
(3)Outage time and downtime requirements.
(c) The commission may develop different standards based on technology type, including, but not limited to, direct current fast charging stations, Level 2 charging stations, charging stations in remote parts of the state, and off-grid charging stations.
(d) The commission
and the Public Utilities Commission shall develop downtime exclusions excluded time criteria from compliance with reliability standards to which the recipient of the state funding is exempt from reliability standards compliance. Downtime exclusions Excluded time criteria may include, but are not limited to, all of the following:
(1) Upstream infrastructure failures such as electrical grid, cellular,
and internet provider outages.
(2) Electric vehicle charging station damage as a result of an accident, vandalism, or improper use.
(3) Electric vehicle charging session failures due to vehicle inoperability problems.
(4) Preventative maintenance.
(5) Unforeseeable circumstances that would have been impossible to plan for using commercially reasonable methods.
(e) The commission may develop requirements and incentives for increasing compliance with the reliability standards.
(f) The commission shall publish data on compliance with the reliability
standards as part of the assessment prepared pursuant to Section 25229. The commission shall protect the confidential information of an entity subject to this section, including, but not limited to, by anonymizing and aggregating the compliance data to ensure an individual entity’s data is not identifiable in the commission’s assessments prepared pursuant to Section 25229.
(g) The requirement established pursuant to subdivision (a) shall apply to all state agency funding that is provided to deploy a publicly available electric vehicle charging station installed on or after July 1, 2023.
(h) For purposes of this section, the following definitions apply:
(1) “Charging station” means an electrical component assembly or
cluster of component assemblies designed specifically to charge batteries within electric vehicles by permitting the transfer of electrical energy to a battery or other storage device in an electric vehicle.
(2)“Downtime” means the inability of an electric vehicle charging station to deliver electricity to an electric vehicle that is caused by charging station hardware or software issues that the electric vehicle charging station provider could conceivably control themselves or through service contracts.
“Downtime” does not include excluded time.
(3)“Excluded time” means a downtime exclusion developed by the commission pursuant to subdivision (d).
(4)“Outage time” means time an electric vehicle charging station is not operational and cannot dispense electricity based on when it is first reported.
(5)“Uptime” means the time an electric vehicle charging station’s hardware and software are both operational and available for use, or in use, and the electric vehicle charging station dispenses electricity at the intended power level. “Uptime” does not include outage time or downtime.
(2) “Excluded time” means the time not included when calculating uptime, as determined pursuant to the determination made by the commission and the Public Utilities Commission pursuant to subdivision (d).
(3) “Uptime” means the time a charging station’s hardware and software are both operational and the charging station dispenses electricity. “Uptime” does not include excluded time.