Bill Text

Bill Information


Add To My Favorites | print page

AB-30 Electric power.(2001-2002)

SHARE THIS: share this bill in Facebook share this bill in Twitter
AB30:v95#DOCUMENT

Amended  IN  Assembly  February 22, 2001
Amended  IN  Assembly  March 06, 2001
Amended  IN  Senate  April 04, 2001
Amended  IN  Senate  May 01, 2001

CALIFORNIA LEGISLATURE— 2001–2002 1st Ext.

Assembly Bill
No. 30


Introduced  by  Assembly Member Cardoza, Salinas
(Coauthor(s): Assembly Member Cohn, Frommer, Reyes, Romero)

February 05, 2001


An act to add Section 2774.5 to the Public Utilities Code, relating to electric power, and declaring the urgency thereof, to take effect immediately.


LEGISLATIVE COUNSEL'S DIGEST


AB 30, as amended, Cardoza. Electric power.
Existing law provides that in the event that any electrical or gas corporation experiences any shortage of electricity or gas and is unable to obtain electricity or gas from any other source so that it is unable to meet the demand of its customers, the Public Utilities Commission is authorized to order that service be temporarily reduced.
This bill would require an electrical corporation or public entity that provides electric power to immediately notify the Commissioner of the California Highway Patrol and the sheriff and any affected chief of police of the specific area within their respective law enforcement jurisdiction that will sustain a planned loss of power as soon as the planned loss becomes known as to when and where that power loss will occur.
This bill would declare that it is to take effect immediately as an urgency statute.
Vote: 2/3   Appropriation: NO   Fiscal Committee: NO   Local Program: NO  

The people of the State of California do enact as follows:


SECTION 1.

 Section 2774.5 is added to the Public Utilities Code, to read:

2774.5.
  An electrical corporation or public entity that provides electric power shall immediately notify the Commissioner of the California Highway Patrol and the sheriff and any affected chief of police of the specific area within their respective law enforcement jurisdictions that will sustain a planned loss of power as soon as the planned loss becomes known as to when and where that power loss will occur. The notification shall include common geographical boundaries, grid or block numbers of the effected area, and the next anticipated power loss area designated by the electrical corporation or public entity during rotating blackouts.

SEC. 2.

 This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to protect the public from increased criminal activity during the current energy shortage, it is necessary for this act to take effect immediately.