2827.
(a)
The Legislature finds and declares that a program to provide net energy metering for eligible customer-generators is one way to encourage private investment in renewable energy resources, stimulate in-state economic growth, enhance the continued diversification of California’s energy resource mix, and reduce interconnection and administrative costs for electricity suppliers.
(b)
As used in this section, the following definitions apply:
(1)
“Electric service provider” means an electric corporation, as defined in Section 218, a local publicly owned electric utility, as defined in Section 9604, or an electrical cooperative, as defined in Section 2776. “Electric service provider” also means an entity that offers electrical service to residential and small commercial customers, as defined in Section 394, if that entity offers net energy metering. Any entity that offers net energy metering to residential and small commercial customers shall comply with this section.
(2)
“Eligible customer-generator” means a residential customer, or a small commercial customer as defined in subdivision (h) of Section 331, of an electric service provider, who uses a solar or a wind turbine electrical generating facility, or a hybrid system of both, with a capacity of not more than 10 kilowatts that is located on the customer’s premises, is interconnected and operates in parallel with the electric grid, and is intended primarily to offset part or all of the customer’s own electrical requirements.
(3)
“Net energy metering” means measuring the difference between the electricity supplied through the electric grid and the electricity generated by an eligible customer-generator and fed back to the electric grid over a 12-month period as described in subdivision (e). Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions. An additional meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the customer-generator, at the expense of the electric service provider, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the customer-generator pursuant to the provisions of subdivision (e), or to collect solar or wind electric generating system performance information for research purposes. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a single meter. An eligible customer-generator who already owns an existing solar or wind turbine electrical generating facility, or a hybrid system of both, is eligible to receive net energy metering service in accordance with this section.
(4)
“Ratemaking authority” means, for an electrical corporation as defined in Section 218, or an electrical cooperative as defined in Section 2776, the commission, and for a local publicly owned electric utility as defined in Section 9604, the local elected body responsible for regulating the rates of the utility.
(c)
(1)
Every electric service provider shall develop a standard contract or tariff providing for net energy metering, and shall make this contract available to eligible customer-generators, upon request, on a first-come, first-served basis until the time that the total rated generating capacity used by eligible customer-generators equals one-tenth of 1 percent of the electric service provider’s aggregate customer peak demand.
(2)
On an annual basis, beginning in 1999, every electric service provider shall make available to the ratemaking authority information on the total rated generating capacity used by eligible customer-generators that are customers of that provider in the provider’s service area. For those electric service providers who are operating pursuant to Section 394, they shall make available to the ratemaking authority the information required by this paragraph for each eligible customer-generator that is their customer for each service area of an electric corporation, local publicly owned electric utility, or electrical cooperative, in which the customer has net energy metering. The ratemaking authority shall develop a process for making the information required by this paragraph available to energy service providers, and for using that information to determine when, pursuant to paragraph (3), a service provider is not obligated to provide net energy metering to additional customer-generators in its service area.
(3)
Notwithstanding paragraph (1), an electric service provider is not obligated to provide net energy metering to additional customer-generators in its service area when the combined total peak demand of all customer-generators served by all the electric service providers in that service area furnishing net energy metering to eligible customer-generators equals one-tenth of 1 percent of the aggregate customer peak demand of those electric service providers.
(d)
Each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if such customer was not an eligible customer-generator. The charges for all retail rate components for eligible customer-generators shall be based exclusively on the customer-generator’s net kilowatthour consumption over a 12-month period, without regard to the customer-generator’s choice of electric service provider, in accordance with subdivision (e). Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or other charge that would increase an eligible customer-generator’s costs beyond those of other customers in the rate class to which the eligible customer-generator would otherwise be assigned are contrary to the intent of this legislation, and shall not form a part of net energy metering contracts or tariffs.
(e)
The net energy metering calculation shall be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electric grid over a 12-month period. The following rules shall apply to the annualized net metering calculation:
(1)
The eligible customer-generator shall, at the end of each 12-month period following the date of final interconnection of the eligible customer-generator’s system with an electric service provider, and at each anniversary date thereafter, be billed for electricity used during that period. The electric service provider shall determine if the eligible customer-generator was a net consumer or a net producer of electricity during that period.
(2)
At the end of each 12-month period, where the electricity supplied during the period by the electric service provider exceeds the electricity generated by the eligible customer-generator during that same period, the eligible customer-generator is a net electricity consumer and the electric service provider shall be owed compensation for the eligible customer-generator’s net kilowatthour consumption over that same period. The compensation owed for the eligible customer-generator’s net 12-month kilowatthour consumption shall be calculated based on the average retail price per kilowatthour for the eligible customer-generator’s rate class over that same period.
(3)
At the end of each 12-month period, where the electricity generated by the eligible customer-generator during the 12-month period exceeds the electricity supplied by the electric service provider during that same period, the eligible customer-generator is a net electricity producer and the electric service provider shall retain any excess kilowatthours generated during the prior 12-month period. The eligible customer-generator shall not be owed any compensation for those excess kilowatthours unless the electric service provider enters into a purchase agreement with the eligible customer-generator for those excess kilowatthours.
(4)
The electric service provider shall provide every eligible customer-generator with net electricity consumption information on each regular bill. That information shall include the current monetary balance owed the electric service provider for net electricity consumed since the last 12-month period ended. Notwithstanding subdivision (e), an electric service provider shall, upon the request of an eligible customer-generator, permit that customer to pay monthly for net energy consumed.
(5)
If an eligible customer-generator terminates the customer relationship with the electric service provider, the electric service provider shall reconcile the eligible customer-generator’s consumption and production of electricity during any part of a 12-month period following the last reconciliation, according to the requirements set forth in this subdivision, except that those requirements shall apply only to the months since the most recent 12-month bill.
(f)
A solar or wind turbine electrical generating system, or a hybrid system of both, used by an eligible customer-generator shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability. A customer-generator whose solar or wind turbine electrical generating system, or a hybrid system of both, meets those standards and rules shall not be required to install additional controls, perform or pay for additional tests, or purchase additional liability insurance.