Code Section

Public Contract Code - PCC

DIVISION 2. GENERAL PROVISIONS [1100 - 22355]

  ( Division 2 enacted by Stats. 1981, Ch. 306. )
  

PART 2. CONTRACTING BY STATE AGENCIES [10100 - 19150]

  ( Heading of Part 2 added by Stats. 1982, Ch. 1120, Sec. 6. )
  

CHAPTER 1. State Contract Act [10100 - 10285.5]

  ( Chapter 1 enacted by Stats. 1981, Ch. 306. )
  

ARTICLE 6. State Agency Design-Build Projects [10187 - 10195]
  ( Article 6 added by Stats. 2014, Ch. 931, Sec. 6. )

  
10191.  

The procurement process for the design-build projects shall progress as follows:

(a) (1) The director shall prepare a set of documents setting forth the scope and estimated price of the project. The documents may include, but need not be limited to, the size, type, and desired design character of the project, performance specifications covering the quality of materials, equipment, workmanship, preliminary plans or building layouts, or any other information deemed necessary to describe adequately the department’s needs. The performance specifications and any plans shall be prepared by a design professional who is duly licensed and registered in California.

(2) The documents shall not include a design-build-operate contract for any project. The documents, however, may include operations during a training or transition period but shall not include long-term operations for any project.

(b) The director shall prepare and issue a request for qualifications in order to prequalify or short-list the design-build entities whose proposals shall be evaluated for final selection. The request for qualifications shall include, but need not be limited to, the following elements:

(1) Identification of the basic scope and needs of the project or contract, the expected cost range, the methodology that will be used by the department to evaluate proposals, the procedure for final selection of the design-build entity, and any other information deemed necessary by the director to inform interested parties of the contracting opportunity.

(2) Significant factors that the department reasonably expects to consider in evaluating qualifications, including technical design and construction expertise, and all other nonprice-related factors.

(3) A standard template request for statements of qualifications prepared by the department. In preparing the standard template, the department may consult with the construction industry, the building trades and surety industry, and other agencies interested in using the authorization provided by this article. The template shall require the following information:

(A) If the design-build entity is a privately held corporation, limited liability company, partnership, or joint venture, a listing of all of the shareholders, partners, or members known at the time of statement of qualification submission who will perform work on the project.

(B) Evidence that the members of the design-build team have completed, or demonstrated the experience, competency, capability, and capacity to complete projects of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project, and a financial statement that ensures that the design-build entity has the capacity to complete the project.

(C) The licenses, registration, and credentials required to design and construct the project, including, but not limited to, information on the revocation or suspension of any license, credential, or registration.

(D) Evidence that establishes that the design-build entity has the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance.

(E) Information concerning workers’ compensation experience history and a worker safety program.

(F) If the proposed design-build entity is a corporation, limited liability company, partnership, joint venture, or other legal entity, a copy of the organizational documents or agreement committing to form the organization.

(G) An acceptable safety record. A proposer’s safety record shall be deemed acceptable if its experience modification rate for the most recent three-year period is an average of 1.00 or less, and its average total recordable injury or illness rate and average lost work rate for the most recent three-year period does not exceed the applicable statistical standards for its business category or if the proposer is a party to an alternative dispute resolution system as provided for in Section 3201.5 of the Labor Code.

(4) (A) The information required under this subdivision shall be certified under penalty of perjury by the design-build entity and its general partners or joint venture members.

(B) Information required under this subdivision that is not otherwise a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) shall not be open to public inspection.

(c) (1) A design-build entity shall not be prequalified or short-listed unless the entity provides an enforceable commitment to the director that the entity and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project or contract that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1.

(2) This subdivision shall not apply if any of the following requirements are met:

(A) The department has entered into a project labor agreement that will bind all contractors and subcontractors performing work on the project or contract to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.

(B) The project or contract is being performed under the extension or renewal of a project labor agreement that was entered into by the department prior to January 1, 2017.

(C) The entity has entered into a project labor agreement that will bind the entity and all its subcontractors at every tier performing the project or contract to use a skilled and trained workforce.

(3) For purposes of this subdivision, “project labor agreement” has the same meaning as in paragraph (1) of subdivision (b) of Section 2500.

(d) Based on the documents prepared as described in subdivision (a), the director shall prepare a request for proposals that invites prequalified or short-listed entities to submit competitive sealed proposals in the manner prescribed by the department. The request for proposals shall include, but need not be limited to, the following elements:

(1) Identification of the basic scope and needs of the project or contract, the estimated cost of the project, the methodology that will be used by the department to evaluate proposals, whether the contract will be awarded on the basis of low bid or best value, and any other information deemed necessary by the department to inform interested parties of the contracting opportunity.

(2) Significant factors that the department reasonably expects to consider in evaluating proposals, including, but not limited to, cost or price and all nonprice-related factors.

(3) The relative importance or the weight assigned to each of the factors identified in the request for proposals.

(4) Where a best value selection method is used, the department may reserve the right to request proposal revisions and hold discussions and negotiations with responsive proposers, in which case the department shall so specify in the request for proposals and shall publish separately or incorporate into the request for proposals applicable procedures to be observed by the department to ensure that any discussions or negotiations are conducted in good faith.

(e) For those projects utilizing low bid as the final selection method, the competitive bidding process shall result in lump-sum bids by the prequalified or short-listed design-build entities, and awards shall be made to the design-build entity that is the lowest responsible bidder.

(f) For those projects utilizing best value as a selection method, the design-build competition shall progress as follows:

(1) Competitive proposals shall be evaluated by using only the criteria and selection procedures specifically identified in the request for proposals. The following minimum factors, however, shall be weighted as deemed appropriate by the department:

(A) Price, unless a stipulated sum is specified.

(B) Technical design and construction expertise.

(C) Life-cycle costs over 15 or more years.

(2) Pursuant to subdivision (d), the department may hold discussions or negotiations with responsive proposers using the process articulated in the department’s request for proposals.

(3) When the evaluation is complete, the responsive proposers shall be ranked based on a determination of value provided, provided that no more than three proposers are required to be ranked.

(4) The award of the contract shall be made to the responsible design-build entity whose proposal is determined by the director to have offered the best value to the public.

(5) Notwithstanding any other provision of this code, upon issuance of a contract award, the director shall publicly announce its award, identifying the design-build entity to which the award is made, along with a statement regarding the basis of the award.

(6) The statement regarding the director’s contract award, described in paragraph (5), and the contract file shall provide sufficient information to satisfy an external audit.

(Amended by Stats. 2021, Ch. 615, Sec. 356. (AB 474) Effective January 1, 2022. Operative January 1, 2023, pursuant to Sec. 463 of Stats. 2021, Ch. 615.)