(f)Beginning on July 1, 1990, and continuing until the regulations adopted by the State Fire Marshal pursuant to subdivision (g) take effect, each pipeline within the State Fire Marshal’s jurisdiction which satisfies any of the following sets of criteria shall be placed on the State Fire Marshal’s list of higher risk pipelines until five years pass without a reportable leak due to corrosion or defect on that pipeline. Initially, pipelines on that list shall be tested by the next scheduled test date, or within two years of being placed on the list, whichever is first. On July 1, 1990, pipeline operators shall provide the State Fire Marshal with a list of all their pipelines which satisfy the criteria in this subdivision as of July 1, 1990. If any pipeline becomes eligible for the list of higher risk pipelines after that date, the pipeline company shall report that fact to the State Fire Marshal within 30 days, and the pipeline shall be placed on the list retroactively to the date on which it became eligible for listing. Pipelines which are found to belong on the list, but are not so reported by the operator to the State Fire Marshal, shall be placed on the list retroactively. Operators failing to properly report their pipelines shall be subject to penalties under Section 51018.6. Pipelines not covered under the risk criteria developed pursuant to subdivision (g) shall be deleted from the list when regulations are adopted pursuant to that subdivision. For purposes of this subdivision, a leak which is traceable to an external force, but for which corrosion is partly responsible, shall be deemed caused by corrosion, “defect” refers to manufacturing or construction defects, and “leak” or “reportable leak” means a rupture required to be reported pursuant to Section 51018. As long as all pipelines are tested in their entirety at least as frequently as standard risk pipelines under subdivisions (c) and (d), it shall suffice for additional tests on higher risk pipelines to cover 20 pipeline miles in all directions along an operator’s pipeline from the position of the leak or leaks which led to the inclusion or retention of that pipeline on the higher risk list. The interim list shall include pipelines which meet any of the following criteria:
(1)Have suffered two or more reportable leaks, not including leaks during a certified hydrostatic pressure test, due to corrosion or defect in the prior three years.
(2)Have suffered three or more reportable leaks, not including leaks during a certified hydrostatic pressure test, due to corrosion, defects, or external forces, but not all due to external forces, in the prior three years.
(3)Have suffered a reportable leak, except during a certified hydrostatic pressure test, due to corrosion or defect of more than 50,000 gallons, or 10,000 gallons in a standard metropolitan statistical area, in the prior three years; or have suffered a leak due to corrosion or defect which the State Fire Marshal finds has resulted in more than 42 gallons of a hazardous liquid within the State Fire Marshal’s jurisdiction entering a waterway in the prior three years; or have suffered a reportable leak of a hazardous liquid with a flashpoint of less than 140 degrees Fahrenheit, or 60 degrees centigrade, in the prior three years.
(4)Are less than 50 miles long, and have experienced a reportable leak, except during a certified hydrostatic pressure test, due to corrosion or a defect in the prior three years. For the purposes of this paragraph, the length of a pipeline with more than two termini shall be the longest distance between two termini along the pipeline.
(5)Have experienced a reportable leak in the prior five years due to corrosion or defect, except during a certified hydrostatic pressure test, on a section of pipe more than 50 years old. For pipelines which fall in this category, and no other category of higher risk pipeline, additional tests required by this subdivision shall be required only on segments of the pipe more than 50 years old as long as all pipe more than 50 years old which is within 20 pipeline miles from the leak in all directions along an operator’s pipeline is tested.