144.
(a) Upon appropriation by the Legislature, the department and the board shall develop a plan to deploy a network of stream gages that includes a determination of funding needs and opportunities for modernizing and reactivating existing gages and deploying new gages in priority locations across hydrologic regions in the state, including reference sites. (b) The department and the board, in consultation with the Department of Fish and Wildlife, the Department of Conservation, the Central Valley Flood Protection Board, interested stakeholders, and, to the extent they wish to consult, local agencies, shall develop the plan to address significant gaps in information necessary for water management and the conservation of freshwater species.
(c) The department and the board shall give priority in the plan to placing or modernizing and reactivating stream gages where lack of data contributes to conflicts in water management actions, including, but not limited to, actions related to the following:
(1) Water supply management.
(2) Flood management.
(3) Water quality management.
(4) Ecosystem management.
(d) Other criteria to be considered by the department and the board in developing the plan include all of the following:
(1) Opportunities for local agencies to enter cost-share arrangements to install or maintain the stream gage.
(2) Ease of integrating the stream gage into the existing network.
(3) Availability of historic gage data for specific locations.
(4) Availability of temperature data for specific locations.
(5) Degree of water quality and flow impacts related to cannabis cultivation.
(6) Integration with the Open and Transparent Water Data Act (Part 4.9 (commencing with Section 12400) of Division 6).