SB-289 Hospitals: seismic safety.(2009-2010)



As Amends the Law Today


SECTION 1.

 Section 1265.8 of the Health and Safety Code is amended to read:

1265.8.
 (a)  In addition to the requirements of this chapter, any person, political subdivision of the state, or governmental agency desiring a license for a health facility  general acute care hospital, as defined in subdivision (a) of Section 1250,  shall file with the state  department a verified  statement that it has complied with the requirements of Chapter  the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (Chapter  1 (commencing with Section 15000) of Division 12.5, 129675) of Part 7 of Division 107),  and it has received approval from the Office of Statewide Health Planning and Development  pursuant to that chapter. The state  department shall not issue any license until such requirement has been met.
(b) The failure to comply with this section shall not be subject to the criminal penalty described in Section 1290.

SEC. 2.

 Section 1265.9 is added to the Health and Safety Code, to read:

1265.9.
 (a)  An individual or entity that seeks initial approval to operate or manage a general acute care hospital licensed pursuant to subdivision (a) of Section 1250 and is subject to Section 1265, shall file with the department a statement that describes the plan for the hospital to comply with the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (Chapter 1 (commencing with Section 129675) of Part 7 of Division 107). The plan shall include a description of the financial capacity that the proposed owner or operator anticipates to be sufficient to ensure timely compliance and a projected timeline for this compliance.
(b) The applicant shall provide the statement described in subdivision (a) to all of the following:
(1) The Facility Development Division of the Office of Statewide Health Planning and Development, which shall post the statement on the office’s Internet Web site.
(2) Any investor or entity holding more than 5 percent of the value of the general acute care hospital.
(3) Any real estate investment trust which holds an interest in the property on which the general acute care hospital is located.
(4) The entity responsible for providing property and casualty insurance coverage for the general acute care hospital.
(5) The entity responsible for the directors and the owner’s liability insurance for the management of the general acute care hospital.
(6) The medical staff of the general acute care hospital.
(7) The collective bargaining agent, if any, that has a contract with the existing licenseholder.
(8) The local planning departments within the local jurisdiction of the general acute care hospital.
(9) Any health care service plans or health insurers that have had contracts with the general acute care hospital within the prior year.
(10) Any contractor that employs workers at the general acute care hospital and, if applicable, the collective bargaining agent representing the subcontracted workers.
(c) The department shall consider whether the applicant has demonstrated a history of substantial compliance with seismic safety requirements, based on information provided by the Office of Statewide Health Planning and Development regarding the record of compliance with respect to any other facilities owned by the same applicant.
(d) Failure to comply with this section shall not be subject to the criminal penalty described in Section 1290.

SEC. 3.

 Section 130060 of the Health and Safety Code is amended to read:

130060.
 (a) (1) After January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or pose significant loss of life shall only be used for nonacute care hospital purposes, unless an extension of this deadline has been granted and either of the following occurs before the end of the extension:
(A) A replacement building has been constructed and a certificate of occupancy has been granted by the department for the replacement building.
(B) A retrofit has been performed on the building and a construction final has been obtained by the department.
(2) (a)  An (1)   extension of the  After January 1, 2008, any general acute care hospital building that is determined to be a potential risk of collapse or pose significant loss of life shall only be used for nonacute care hospital purposes. A delay in this  deadline may be granted by the department office  upon a demonstration by the owner that compliance will result in a loss of health care capacity that may not be provided by other general acute care hospitals within a reasonable proximity. In its request for an extension of the deadline, a hospital shall state why the hospital is unable to comply with the January 1, 2008, deadline requirement.
(3) (2)  Prior to granting an extension of the January 1, 2008, deadline pursuant to this section, the department office  shall do all of the following:
(A) Provide public notice of a hospital’s request for an extension of the deadline. The notice, at a minimum, shall be posted on the department’s internet website,  office’s Internet Web site,  and shall include the facility’s name and identification number, the status of the request, and the beginning and ending dates of the comment period, and shall advise the public of the opportunity to submit public comments pursuant to subparagraph (C). The department office  shall also provide notice of all requests for the deadline extension directly to interested parties upon request of the interested parties.
(B) Provide copies of extension requests to interested parties within 10 working days to allow interested parties to review and provide comment within the 45-day comment period. The copies shall include those records that are available to the public pursuant to the California  Public Records Act (Division 10 Act, Chapter 3.5  (commencing with Section 7920.000) of  6250) of Division 7 of  Title 1 of the Government Code). Code. 
(C) Allow the public to submit written comments on the extension proposal for a period of not less than 45 days from the date of the public notice.
(b) (1)   It is the intent of the Legislature, in enacting this subdivision, to facilitate the process of having more hospital buildings in substantial compliance with this chapter and to take nonconforming general acute care hospital inpatient buildings out of service more quickly.
(2) The functional contiguous grouping of hospital buildings of a general acute care hospital, each of which provides, as the primary source, one or more of the hospital’s eight basic services as specified in subdivision (a) of Section 1250, may receive a five-year extension of the January 1, 2008, deadline specified in subdivision (a) of this section pursuant to this subdivision for both structural and nonstructural requirements. A functional contiguous grouping refers to buildings containing one or more basic hospital services that are either attached or connected in a way that is acceptable to the State Department of Health Care Services.  Public Health.  These buildings may be either on the existing site or a new site.
(3) To receive the five-year extension, a single building containing all of the basic services or at least one building within the contiguous grouping of hospital buildings shall have obtained a building permit prior to 1973 and this building shall be evaluated and classified as a nonconforming, Structural Performance Category-1 (SPC-1) building. The classification shall be submitted to and accepted by the Department Office  of Statewide  Health Care Access  Planning  and Information. Development.  The identified hospital building shall be exempt from the requirement in subdivision (a) until January 1, 2013, if the hospital agrees that the basic service or services that were provided in that building shall be provided, on or before January 1, 2013, as follows:
(A) Moved into an existing conforming Structural Performance Category-3 (SPC-3), Structural Performance Category-4 (SPC-4), or Structural Performance Category-5 (SPC-5) and Non-Structural Performance Category-4 (NPC-4) or Non-Structural Performance Category-5 (NPC-5) building.
(B) Relocated to a newly built compliant SPC-5 and NPC-4 or NPC-5 building.
(C) Continued in the building if the building is retrofitted to an a  SPC-5 and NPC-4 or NPC-5 building.
(4) A five-year extension is also provided to a post-1973  post 1973  building if the hospital owner informs the Department Office  of Statewide  Health Care Access  Planning  and Information Development  that the building is classified as a  SPC-1, SPC-3, or SPC-4 and will be closed to general acute care inpatient service use by January 1, 2013. The basic services in the building shall be relocated into an a  SPC-5 and NPC-4 or NPC-5 building by January 1, 2013.
(5) SPC-1 buildings, other than the building identified in paragraph (3) or (4), in the contiguous grouping of hospital buildings shall also be exempt from the requirement in subdivision (a) until January 1, 2013. However, on or before January 1, 2013, at a minimum, each of these buildings shall be retrofitted to an a  SPC-2 and NPC-3 building, or no longer be used for general acute care hospital inpatient services.
(c) On or before March 1, 2001, the department office  shall establish a schedule of interim work progress deadlines that hospitals shall be required to meet to be eligible for the extension specified in subdivision (b). To receive this extension, the hospital building or buildings shall meet the year 2002 nonstructural requirements.
(d) A hospital building that is eligible for an extension pursuant to this section shall meet the January 1, 2030, nonstructural and structural deadline requirements if the building is to be used for general acute care inpatient services after January 1, 2030.
(e) Upon compliance with subdivision (b), the hospital shall be issued a written notice of compliance by the department. office.  The department office  shall send a written notice of violation to hospital owners that fail to comply with this section. The department office  shall make copies of these notices available on its internet website. Internet Web site. 
(f) (1) A hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) may request an additional extension of up to two years for a hospital building that it owns or operates and that meets the criteria specified in paragraph (2), (3), (5),  or (5). (6). 
(2) The department office  may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A) The hospital building is under construction at the time of the request for extension under this subdivision and the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the department office  pursuant to subdivision (a) or (b).
(B) The hospital building plans were submitted to the department office  and were deemed ready for review by the department office  at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C) The hospital received a building permit for the construction described in subparagraph (A) at least two years prior to the applicable deadline for the building. building or, if the building failed to be reclassified as an SPC-2 building pursuant to paragraph (6), at least one year prior to the applicable deadline. 
(D) The hospital submitted a construction timeline at least two years prior to the applicable deadline for the building demonstrating the hospital’s intent to meet the applicable deadline or, if the building failed to be reclassified as an SPC-2 building pursuant to paragraph (6), at least one year prior to the applicable  deadline. The timeline shall include all of the following:
(i) The projected construction start date.
(ii) The projected construction completion date.
(iii) Identification of the contractor.
(E) The hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D), but factors beyond the hospital’s control make it impossible for the hospital to meet the deadline.
(3) The department office  may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A) The hospital building is owned by a health care district that has, as owner, received the extension of the January 1, 2008, deadline, but where the hospital is operated by an unaffiliated third-party lessee pursuant to a facility lease that extends at least through December 31, 2009. The district shall file a declaration with the department office  with a request for an extension stating that, as of the date of the filing, the district has lacked, and continues to lack, unrestricted access to the subject hospital building for seismic planning purposes during the term of the lease, and that the district is under contract with the county to maintain hospital services when the hospital comes under district control. The department office  shall not grant the extension if an unaffiliated third-party lessee will operate the hospital beyond December 31, 2010.
(B) The hospital building plans were submitted to the department office  and were deemed ready for review by the department office  at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C) The hospital received a building permit for the construction described in subparagraph (B) by December 31, 2011.
(D) The hospital submitted, by December 31, 2011, a construction timeline for the building demonstrating the hospital’s intent and ability to meet the deadline of December 31, 2014. The timeline shall include all of the following:
(i) The projected construction start date.
(ii) The projected construction completion date.
(iii) Identification of the contractor.
(E) The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F) The hospital granted an extension pursuant to this paragraph shall submit an additional status report to the department, office,  equivalent to that required by subdivision (c) of Section 130061, no later than June 30, 2013.
(4) An extension granted pursuant to paragraph (3) shall be applicable only to the health care district applicant and its affiliated hospital while the hospital is operated by the district or an entity under the control of the district.
(5) The department office  may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A) The hospital owner submitted to the department, office,  prior to June 30, 2009, a request for review using current  computer modeling utilized by the department  office pursuant to regulations in effect on or prior to June 30, 2009,  and based upon software developed by the Federal Emergency Management Agency (FEMA),  Agency,  referred to as Hazards US, and the building was deemed SPC-1 after that review.
(B) The hospital building plans for the building are submitted to the department office  and deemed ready for review by the department office  prior to July 1, 2010. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that shall be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C) The hospital receives a building permit from the department office  for the construction described in subparagraph (B) prior to January 1, 2012.
(D) The hospital submits, prior to January 1, 2012, a construction timeline for the building demonstrating the hospital’s intent and ability to meet the applicable deadline. The timeline shall include all of the following:
(i) The projected construction start date.
(ii) The projected construction completion date.
(iii) Identification of the contractor.
(E) The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the department office  pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F) The hospital owner completes construction such that  in order for  the hospital meets  to meet  all the  criteria to enable the department office  to issue a certificate of occupancy by the applicable deadline for the building.
(6) A hospital located in the County of Sacramento, San Mateo, or Santa Barbara or the City of San Jose or the City of Willits that has received an additional extension pursuant to paragraph (2) or (5) may request an additional extension until September 1, 2015, to obtain either a certificate of occupancy from the department for a replacement building, or a construction final from the department for a building on which a retrofit has been performed.
(7) A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(8) The department may revoke an extension granted pursuant to this subdivision for any hospital building where the work of construction is abandoned or suspended for a period of at least one year, unless the hospital demonstrates in a public document that the abandonment or suspension was caused by factors beyond its control.
(g) (1) Notwithstanding subdivisions (a), (b), (c), and (f), and Sections 130061.5 and 130064, a hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) also may request an additional extension of up to seven years for a hospital building that it owns or operates. The department may grant the extension subject to the hospital meeting the milestones set forth in paragraph (2).
(2) (6)  The hospital building subject to the extension shall meet  office may grant the additional extension if  all of the following milestones, unless the hospital building is reclassified as SPC-2 or higher as a result of its Hazards US score: conditions are met: 
(A) The hospital owner submits to the department, no later than September 30, 2012, a letter of intent stating whether it intends to rebuild, replace, or retrofit the building, or remove all general acute care beds and services from the building, and the amount of time necessary to complete the construction. provides documentation to the office by January 20, 2011, stating the owner’s intent to comply with the January 1, 2013, deadline requirements described in subdivisions (a) and (b) by using computer modeling utilized by the office pursuant to regulations adopted after June 30, 2009, but before December 30, 2010, and based upon Hazards US. 
(B) The hospital owner submits to the department, no later than September 30, 2012, a schedule detailing why the requested extension is necessary, and specifically how the hospital intends to meet the requested deadline. office by July 1, 2011, a request for review using computer modeling utilized by the office pursuant to regulations adopted after June 30, 2009, but before December 30, 2010, and based upon Hazards US, and the hospital plans to mitigate targeted structural deficiencies to meet the SPC-2 requirements. 
(C) The hospital owner submits to the department, no later than September 30, 2012, an application  building plans for the building are submitted to the office and deemed  ready for review seeking structural reassessment of each of its SPC-1 buildings using current computer modeling based upon software developed by FEMA, referred to as Hazards US. by the office prior to January 1, 2012. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that shall be retrofitted or replaced to meet the requirements of this section as a result of the project. The hospital shall also provide a proposed construction timeframe to complete the project once the permit is issued. The construction timeframe shall be approved by the office and shall only include the amount of time that is reasonably necessary to complete the construction required to meet the SPC-2 requirement. 
(D) The hospital owner submits to the department, no later than January 1, 2015, plans ready for review consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B). receives a building permit from the office for the construction described in subparagraph (B) prior to January 1, 2013. 
(E) The hospital owner submits a financial report to the department at the time the plans are submitted pursuant to subparagraph (D). The report shall demonstrate the hospital owner’s financial capacity to implement the construction plans submitted pursuant to subparagraph (D). provides documentation upon application stating that the purpose of the construction is to meet the requirements of subdivision (a), to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and to make reasonable progress toward meeting the timeline set forth in subparagraph (C). 
(F) The hospital owner receives a building permit consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B), no later than July 1, 2018.
(3) To evaluate public safety and determine whether to grant an extension of the deadline, the department shall consider the structural integrity of the hospital’s SPC-1 buildings based on its Hazards US scores, community access to essential hospital services, and the hospital owner’s financial capacity to meet the deadline as determined by either a bond rating of BBB or below or the financial report on the hospital owner’s financial capacity submitted pursuant to subparagraph (E) of paragraph (2). The criteria contained in this paragraph shall be considered by the department in its determination of the length of an extension or whether an extension should be granted.
(4) (F)  The extension or subsequent adjustments granted additional extension granted by the office  pursuant to this subdivision paragraph  may not exceed the lesser of two years or the  amount of time that is reasonably necessary to complete the construction specified in paragraph (2). that is required for the building to meet the SPC-2 requirement. The extension may be adjusted for delays in construction that are beyond the control of the hospital, but not exceed a total of 24 months beyond 2013. 
(5) (G)  If the circumstances underlying the request for extension submitted to the department pursuant to paragraph (2) change, the hospital owner shall notify the department as soon as practicable, but in no event later than six months after the hospital owner discovered the change of circumstances. The department may adjust the length of the extension granted pursuant to paragraphs (2) and (3) as necessary, but in no event longer than the period specified in paragraph (1). The hospital owner completes construction in order for the hospital to meet all the criteria to enable the office to issue a certificate of occupancy by the applicable deadline for the building. 
(6) (7)  A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(7) (8)  The department office  may revoke an extension granted pursuant to this subdivision for any hospital building when it is determined that any information submitted pursuant to this section was falsified, or if the hospital failed to meet a milestone set forth in paragraph (2), or  where the work of construction is abandoned or suspended for a period of at least six months, unless the hospital demonstrates in a publicly available  public  document that the abandonment or suspension was caused by factors beyond its control.
(8) Regulatory submissions made by the department to the California Building Standards Commission to implement this section shall be deemed to be emergency regulations and shall be adopted as emergency regulations.
(9) The hospital owner that applies for an extension pursuant to this subdivision shall pay the office an additional fee, to be determined by the department, sufficient to cover the additional reasonable costs incurred by the department for maintaining the additional reporting requirements established under this section, including, but not limited to, the costs of reviewing and verifying the extension documentation submitted pursuant to this subdivision. This additional fee shall not include any cost for review of the plans or other duties related to receiving a building or occupancy permit.
(10) This subdivision shall become operative on the date that the State Department of Health Care Services receives all necessary federal approvals for a 2011–12 fiscal year hospital quality assurance fee program that includes three hundred twenty million dollars ($320,000,000) in fee revenue to pay for health care coverage for children, which is made available as a result of the legislative enactment of a 2011–12 fiscal year hospital quality assurance fee program.
(h) A critical access hospital located in the City of Tehachapi may submit a seismic safety extension application pursuant to subdivision (g), notwithstanding deadlines in that subdivision that are earlier than the effective date of the act that added this subdivision. The submitted application shall include a timetable as required pursuant to subdivision (g).
(i) (1) A hospital located in the Tarzana neighborhood of the City of Los Angeles that has received extensions pursuant to subdivisions (b) and (g) may request an additional extension for a single building until October 1, 2022, in order to obtain a certificate of occupancy from the department for a replacement building.
(2) The hospital owner seeking the extension shall submit a written request that includes a timeline specifying how the hospital intends to meet the new deadline, including the construction document submission dates. The following timeline shall be met for construction document submissions:
(A) No later than January 1, 2018, the hospital owner shall submit construction documents, deemed ready for review, related to the first final review of the second increment with information including the building core and shell of the hospital. Failure to submit the construction documents by January 1, 2018, shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the documents are submitted.
(B) No later than March 1, 2018, the hospital owner shall submit construction documents, deemed ready for review, related to the first final review of the first increment with information including the structural foundation, frame, and underslab utilities of the hospital. Failure to submit the construction documents by March 1, 2018, shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the documents are submitted.
(C) No later than September 1, 2018, the hospital owner shall submit construction documents, deemed ready for review, related to the first final review of the third increment with information on the build-out of the hospital. Failure to submit the construction documents by September 1, 2018, shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the documents are submitted.
(D) No later than November 1, 2018, the hospital owner shall submit construction documents, deemed ready for review, related to the first final review of the fourth increment with information on the seismic support and anchorage of the hospital. Failure to submit the construction documents by November 1, 2018, shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the documents are submitted.
(E) The hospital owner may submit a written request to the department seeking an extension of the deadlines set forth in subparagraphs (A), (B), (C), and (D). The written request shall state with specificity the reason for the request and how the reason preventing compliance with the deadlines was outside of the control of the hospital owner. After review of the request for extension, the department may grant the request for a period of time not to exceed 30 calendar days. If the department grants the request for an extension, no fine shall accrue or be imposed during the extension period.
(3) (g)  Notwithstanding any other law, any fines assessed pursuant to paragraph (2) shall be deposited into the General Fund following a determination on appeal, if any. A hospital assessed a fine  All submissions to the office to obtain an extension pursuant to subdivision (f) and Section 130061.5 and to comply with the requirements of Section 130061, shall be complete and accurate. In addition to the penalty described in subdivision (g) of Section 130064, the office shall deny or revoke an extension pursuant to this chapter if the office determines that the information submitted had a material effect on the granting of the extension. A hospital that is denied an extension  pursuant to this subdivision may appeal the assessment denial  to the Hospital Building Safety Board, provided the hospital posts the funds for any fines to be held by the department pending the resolution of the appeal. Board. 
(4) The department shall not issue a certificate of occupancy for the single replacement building until all assessed fines accrued pursuant to paragraph (2) have been paid in full, or, if an appeal is pending, have been posted subject to resolution of an appeal. Fines deposited by the hospital pursuant to paragraph (3) shall be considered paid in full for purposes of issuing a certificate of occupancy pursuant to this paragraph. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance by the department of a certificate of occupancy.

SEC. 4.

 Section 130064 is added to the Health and Safety Code, to read:

130064.
 (a) In lieu of the extension described in subdivision (f) of Section 130060, the office may grant an extension to a general acute care hospital pursuant to either subdivision (c) or subdivision (f) if the hospital building, due to a local planning delay, will not meet the seismic safety standards of that section by January 1, 2013.
(b) When applying for an extension under this section, the owner of the general acute care hospital shall submit to the office documentation that includes at least all of the following:
(1) The original schedule of the project or projects, as had originally been anticipated.
(2) The schedule of the project or projects, as currently projected.
(3) Documentation that the timeline for the submission of the documents to the local planning authority or jurisdiction.
(4) The local planning authority for the project and for the enabling phases of the project does not grant approvals prior to November 1, 2010, if the hospital had originally filed the local application prior to January 1, 2008.
(5) A proposed construction timeframe demonstrating the completion of the project once the permit is issued. The construction timeframe shall be approved by the office and shall only include the amount of time that is reasonably necessary to complete the construction required to meet the seismic requirements.
(c) The office may grant an extension, in full one-year increments, but no longer than three consecutive years, which compensates for delays determined pursuant to subdivision (d).
(d) The office shall conduct a comprehensive review of the schedule for the project or projects according to criteria specified in this section. This review shall encompass the project or projects under jurisdiction of the office, as well as other project phases not under the jurisdiction of the office. The office shall consider the cumulative effect of local approval timelines for all elements of the project or projects, inclusive of changes in scope or sequence of the project or projects required by the local planning process. The office may grant extensions based on evaluation of all of the following circumstances:
(1) If the local planning authority approvals have delayed or will delay the construction start date of the project or projects.
(2) If the local conditions of approval on a project or projects extend the duration beyond the originally anticipated construction completion date.
(3) If the cumulative effect of delays on the project or projects creates additional construction delays due to local seasonal weather impact requirements of the local planning authority.
(4) Construction related to the seismic retrofit or replacement project has begun by January 1, 2013.
(5) The project was submitted for review by the department no later than January 1, 2009.
(6) The project has received a building permit from the department no later than January 1, 2012.
(e) Every six months after the approval of the extension, the hospital owner shall report to the office on the status of the project or projects, demonstrating that it is making reasonable progress toward meeting the construction timeline.
(f) The office may revoke an extension granted pursuant to this section for any hospital building where the work of construction is abandoned or suspended for a period of at least six months, unless the hospital demonstrates that the abandonment or suspension was caused by factors beyond its control.
(g) The office may revoke an extension granted pursuant to this section if it is determined that any information submitted pursuant to this section was falsified in any manner by the hospital or if the hospital fails to meet any of the criteria or conditions specified in this section.
(h) Regulatory submissions made by the office to the California Building Standards Commission pursuant to this section shall be deemed, and shall be adopted as, emergency regulations.
(i) The hospital owner shall pay to the office an additional fee, as determined by the office, sufficient to cover the additional cost incurred by the office for maintaining all reporting requirements established under this section, including, but not limited to, the costs of reviewing and verifying the extension documentation submitted pursuant to subdivisions (b), (d), and (e). The additional fee shall not include any cost for review of the plans or other duties related to receiving a building or occupancy permit.
(j) A hospital denied an extension pursuant to this section may appeal the denial to the Hospital Building Safety Board.

SEC. 4.5.

 Section 130064 is added to the Health and Safety Code, to read:

130064.
 (a) In lieu of the extension described in subdivision (f) of Section 130060, the office may grant an extension to a general acute care hospital pursuant to either subdivision (c) or (f) if the hospital building will not meet the seismic safety standards of that section by January 1, 2013, due to a local planning delay.
(b) When applying for an extension under this section, the owner of the general acute care hospital shall submit to the office documentation that includes at least all of the following:
(1) The original schedule of the project or projects as had been originally anticipated.
(2) The schedule of the project or projects as currently projected.
(3) A timeline for the submission of documents to the local planning authority or jurisdiction.
(4) Documentation that the local planning authority for the project and for the enabling phases of the project does not grant approvals prior to November 1, 2010, where the hospital had originally filed the local application prior to January 1, 2008.
(5) A proposed construction timeframe demonstrating the completion of the project once the permit is issued. The construction timeframe shall be approved by the office and shall only include the amount of time that is reasonably necessary to complete the construction required to meet the seismic safety requirements.
(c) The office may grant an extension, in full one-year increments, but no longer than three consecutive years, that compensates for delays determined pursuant to subdivision (d).
(d) The office shall conduct a comprehensive review of the schedule for the project or projects according to criteria specified in this section. This review shall encompass the project or projects under the jurisdiction of the office, as well as other project phases not under the jurisdiction of the office. The office shall consider the cumulative effect of local approval timelines for all elements of the project or projects, inclusive of changes in scope or sequence of the project or projects required by the local planning process. The office may grant extensions based on an evaluation of each of the following circumstances:
(1) Where the local planning authority approvals have delayed or will delay the construction start date of the project or projects.
(2) Where the local conditions of approval on a project or projects extend the duration beyond the originally anticipated construction completion date.
(3) Where the cumulative effect of delays on the project or projects creates additional construction delays due to local seasonal weather impact requirements of the local planning authority.
(4) Construction related to the seismic retrofit or replacement project has begun by January 1, 2013.
(5) The project or projects were submitted for review by the department no later than January 1, 2009.
(6) The project or projects have received a building permit from the department no later than January 1, 2012.
(e) Every six months after the approval of the extension, the hospital owner shall report to the office on the status of the project or projects, demonstrating that it is making reasonable progress toward meeting the construction timeline.
(f) The office may grant an additional extension of up to two years in addition to the extension granted pursuant to subdivisions (c) and (d) only if the project or projects meet all of the following criteria:
(1) A matrix of buildings at the hospital that identifies compliance of each building to the standards required by Section 130065 at the completion of the project or projects.
(2) The construction timelines submitted pursuant to subdivision (a) were determined to go beyond three years from the date the building permit was issued.
(3) Acute care services will not be provided in any SPC-1 building at any time during the extension.
(4) The hospital demonstrates that it has, and maintains throughout the extension, life safety systems in all acute care patient care areas that do not depend on, and are not routed through, an SPC-1 building.
(5) The hospital either demonstrates that the SPC-1 building does not pose a structural risk to an adjoining hospital building that is used for acute care services or mitigates the risk in accordance with a deadline described in subdivision (f) of Section 130060 that the office determines will best protect patient safety.
(g) The office may revoke an extension granted pursuant to this section for any hospital building where the work of construction is abandoned or suspended for a period of at least six months, unless the hospital demonstrates that the abandonment or suspension was caused by factors beyond its control.
(h) The office may revoke an extension granted pursuant to this section if it is determined that any information submitted pursuant to this section was falsified in any manner by the hospital or if the hospital fails to meet any of the criteria or conditions specified in this section.
(i) Regulatory submissions made by the office to the California Building Standards Commission pursuant to this section shall be deemed, and shall be adopted as, emergency regulations.
(j) The hospital owner that applies for an extension pursuant to this section shall pay to the office an additional fee, to be determined by the office, sufficient to cover the additional cost incurred by the office for maintaining all reporting requirements established under this section, including, but not limited to, the costs of reviewing and verifying the extension documentation submitted pursuant to this section. This additional fee shall not include any cost for review of the plans or other duties related to receiving a building or occupancy permit.
(k) A hospital denied an extension pursuant to this section may appeal the denial to the Hospital Building Safety Board.

SEC. 5.

 Section 130065.1 is added to the Health and Safety Code, to read:

130065.1.
 (a) On or before January 1, 2016, a general acute care hospital shall report all of the following to the office:
(A) Current configuration of all buildings on its campus, including each structural performance category.
(B) The number of acute care beds and the basic and supplemental services provided in each building.
(C) Identification of each building that needs to meet the structural and nonstructural requirements of Section 130065.
(D) If a hospital building is under construction, or beginning construction, to meet the requirements of Section 130060, 130061.5, 130064, or 130065 the hospital shall provide project numbers for each building.
(b) (1) On or before January 1, 2020, a hospital shall submit a master plan for all the buildings that are subject to subdivision (a) of Section 130065 that the hospital intends to rebuild or replace by January 1, 2030. The hospital master plan shall identify at least all of the following:
(A) Each building that is subject to subdivision (a) of Section 130065.
(B) The current plan to rebuild or replace each building with buildings that would be in compliance with subdivision (a) of Section 130065, including all structural and nonstructural requirements.
(C) The building or buildings to be removed from acute care service and the projected date or dates of that action.
(D) The location for any new building or buildings, including, but not limited to, whether the owner has received a permit for that location.
(E) A copy of the preliminary design for the new building or buildings.
(F) The number of beds available for acute care use in each new building.
(G) The timeline for completed plan submission.
(H) The proposed construction timeline.
(I) The proposed cost at the time of submission.
(J) A copy of any records indicating the hospital governing board’s approval of the hospital master plan.
(2) On or before January 1, 2023, the hospital owner submits to the office a building plan for each building that is deemed ready for review by the office.
(3) On or before January 1, 2025, the hospital owner receives a building permit to begin construction for each building that the owner intends to replace or retrofit pursuant to the master plan.
(4) Within six months of receipt of the building permit, the hospital owner submits a construction timeline that identifies at least all of the following:
(A) Each building that is subject to subdivision (a) of Section 130065.
(B) The project number or numbers for replacement of each building.
(C) The projected construction start date or dates and projected construction completion date or dates.
(D) The building or buildings to be removed from acute care.
(E) The estimated cost of construction.
(F) The name of the contractor.
(5) Every six months thereafter, the hospital owner shall report to the office on the status of the project, including any delays or circumstances that could materially affect the estimated completion date.
(c) A hospital that has not submitted a report pursuant to this section shall be assessed a civil penalty of ten dollars ($10) per licensed acute care bed per day, but in no case to exceed one thousand dollars ($1,000) per day for each SPC-1 building not in compliance with this section until it has complied with this section. These civil penalties shall be deposited into the Facilities Penalties Account established pursuant to Section 130066. A hospital assessed a civil penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board.
(d) The office shall make the information required by subdivisions (a) and (b), available on its Internet Web site within 90 days of receipt of this information.

SEC. 6.

 Section 130066 is added to the Health and Safety Code, to read:

130066.
 (a) A hospital that complies with Section 130060 may post a sign at all public entrances to the hospital building that states:

“THE STATE OF CALIFORNIA HAS DETERMINED THAT THIS HOSPITAL FACILITY HAS COMPLIED WITH APPLICABLE STATE SEISMIC SAFETY LAWS FOR HOSPITALS.”

(b) A hospital that has an SPC-l building shall post a sign at all public entrances to the building that states:

“THE STATE OF CALIFORNIA HAS DETERMINED THAT THIS HOSPITAL HAS BUILDING(S) THAT ARE AT RISK OF COLLAPSE IN A MAJOR EARTHQUAKE. The plan of compliance for this hospital is available for your review at the hospital’s Internet Web site, (insert Internet Web site address). To receive additional information regarding hospital seismic safety, go to www.oshpd.ca.gov.”

(c) All signs posted pursuant to subdivision (a) or (b) shall be posted in a conspicuous place at all public entrances of the building, and shall be not less than five inches by seven inches in size and be printed in no less than 30-point bold type.
(d) The plan of compliance required to be publicly available in subdivision (b) is the reporting specified in subdivision (c) of Section 130061.
(e) By February 1, 2011, each hospital that has an SPC-l building shall certify in writing to the office that it has complied with subdivisions (b), (c), and (d). Failure to post the sign required in subdivision (b) shall result in the hospital being assessed a civil penalty of ten dollars ($10) per licensed acute care bed per each day that the hospital fails to post the sign required in subdivision (b), but in no case to exceed one thousand dollars ($1,000) per day for each SPC-l building. These fines shall be deposited into the Facilities Penalties Account which is hereby established within the Hospital Building Fund established pursuant to Section 129795. A hospital assessed a civil penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board. Notwithstanding Section 129795, moneys in the account are not continuously appropriated pursuant to that section, and shall be available for expenditure only upon appropriation by the Legislature in the annual Budget Act or other measure.
SEC. 7.
 (a) Section 4.5 of this bill shall only become operative if (1) both this bill and Senate Bill 289 are enacted and become effective on or before January 1, 2011, (2) each bill adds Section 130064 to the Health and Safety Code, and (3) this bill is enacted after Senate Bill 608, in which case Section 4 of this bill shall not become operative.
(b) Neither Section 4 nor Section 4.5 of this bill shall become operative if (1) both bills are enacted and become effective on or before January 1, 2011, (2) each bill adds Section 130064 to the Health and Safety Code, and (3) Senate Bill 608 is enacted after this bill.