Amended
IN
Senate
April 17, 2001 |
Introduced by
Senator
Knight |
February 06, 2001 |
(a)To the extent permitted by the federal Clean Air Act (42 U.S.C. Sec. 7401 et seq.), and notwithstanding Section 65950 of the Government Code, a district may issue a temporary, expedited, consolidated permit, as provided by Sections 42300.1 and 42301.3, for a powerplant within 60 days after the date of certification of an environmental impact report, within 30 days after the adoption of a negative declaration, or within 30 days after the date of a determination that the project is exempt from Division 13 (commencing with Section 21000) of the Public Resources Code, if all of the following conditions are met:
(1)The powerplant will emit less than 5 parts per million of oxides of nitrogen averaged over a three-hour period.
(2)The powerplant will operate exclusively under the terms of a contract entered into with the Independent System Operator and approved by the Electricity Oversight Board established pursuant to Article 2 (commencing with Section 334) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code.
(3)The owner or operator of the powerplant shall demonstrate that the powerplant, on average, will displace electrical generation that produces greater air emissions in the same air basin or in a basin that causes air pollution transport into that basin.
(4)The powerplant will be interconnected to the grid in a manner that the Public Utilities Commission, in consultation with the Electricity Oversight Board, has determined will allow the powerplant to provide service to a geographical area of the state that is urgently in need of generation in order to provide reliable electric service. However, nothing in this paragraph affects the authority of the Energy Resources Conservation and Development Commission over powerplants pursuant to Chapter 6 (commencing with Section 25500) of Division 15 of the Public Resources Code.
(5)The powerplant will be operated at a location that has the necessary fueling and electrical transmission and distribution infrastructure for its operation.
(6)The owner or operator of the powerplant enters into a binding and enforceable agreement with the district, and where applicable, with the Energy Resources Conservation and Development Commission, which demonstrates either of the following:
(A)That the powerplant will cease to operate and the permit will terminate within three years.
(B)That the powerplant will be modified, replaced, or removed within a period of three years with a combined-cycle powerplant that uses best available control technology and offsets, as determined at the time the combined-cycle plant is constructed, and that complies with all other applicable laws and regulations.
(7)Where applicable, the owner or operator of the powerplant will obtain offsets or, where offsets are unavailable, pay an air emissions mitigation fee to the district based upon the actual emissions from the powerplant, to the district for expenditure by the district pursuant to Chapter 9 (commencing with Section 44275) of Part 5, to mitigate the emissions from the plant.
(8)It is the intent of the Legislature in this section to encourage the expedited siting of cleaner generating units to address peaking power needs. It is further the intent of the Legislature to require local air quality management districts and air pollution control districts to recognize the critical need for these facilities and the short life span of these facilities in exercising their discretionary authority to apply more restrictive air quality regulations than would otherwise be required by law.
(b)(1)This section may be utilized for the purpose of expediting the siting of electrical generating facilities pursuant to Chapter 6 (commencing with Section 25500) of Division 15 of the Public Resources Code.
(2)For purposes of this section, the siting of an electrical generating facility, pursuant to Section 25556 of the Public Resources Code, on an active or closed military installation shall be considered a separate stationary source, if that designation is consistent with the state implementation plan. The siting pursuant to this paragraph shall not be included in the air pollution calculations for military installation operations.
(c)This section shall remain in effect only until January 1, 2004, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2004, deletes or extends that date.