Bill History


PDF |Add To My Favorites |Track Bill | print page

AB-2932 City of Long Beach: design-build process.(2019-2020)

Date Action
09/09/20 Chaptered by Secretary of State - Chapter 54, Statutes of 2020.
09/09/20 Approved by the Governor.
09/04/20 Enrolled and presented to the Governor at 2 p.m.
08/28/20 In Assembly. Ordered to Engrossing and Enrolling.
08/28/20 Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. (Ayes 39. Noes 0. Page 4372.).
07/31/20 Read second time. Ordered to Consent Calendar.
07/30/20 From committee: Do pass. To Consent Calendar. (Ayes 7. Noes 0.) (July 29).
07/01/20 Referred to Com. on GOV. & F.
06/16/20 In Senate. Read first time. To Com. on RLS. for assignment.
06/15/20 Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 79. Noes 0. Page 4850.).
06/10/20 Read third time and amended. Ordered to third reading. (Page 4746.)
05/13/20 Read second time. Ordered to third reading.
05/12/20 From committee: Do pass. (Ayes 8. Noes 0.) (May 12).
03/05/20 Referred to Com. on L. GOV.
02/24/20 Read first time.
02/22/20 From printer. May be heard in committee March 23.
02/21/20 Introduced. To print.