79731.
(a) Except as provided in subdivision (f), the department shall award grants to eligible projects that implement an adopted integrated regional water management plan.(b) An urban water supplier that does not prepare, adopt, and submit its urban water management plan in accordance with the Urban Water Management Planning Act (Part 2.6 (commencing with Section 10610) of Division 6) is ineligible to receive funds made available pursuant to Section 79730 until the urban water management plan is prepared and submitted in accordance with the requirements of that act.
(c) For the purposes of awarding a grant under this chapter, the department shall require a local cost share of not less than 50 percent of the total costs of the project. The department may waive or reduce the cost-sharing requirement for projects that directly benefit a disadvantaged community or an economically distressed area.
(d) Eligible projects are those included in adopted integrated regional water management plans consistent with Part 2.2 (commencing with Section 10530) of Division 6, including, but not limited to, local and regional surface water storage projects.
(e) The funding provided in Section 79730 shall be allocated to each hydrologic region as identified in the California Water Plan in accordance with this subdivision. For the South Coast hydrologic region, the department shall establish three funding areas that reflect the watersheds of San Diego County (designated as the San Diego subregion), the Santa Ana River watershed and southern Orange County (designated as the Santa Ana subregion), and the Los Angeles and Ventura County watersheds (designated as the Los Angeles subregion), and shall allocate funds to those areas in accordance with this subdivision. The North and South Lahontan hydrologic regions shall be treated as one area for the purpose of allocating funds. For purposes of this subdivision, the Sacramento River hydrologic region does not include the Delta. For purposes of this subdivision, the Mountain Counties Overlay is not eligible for funds from the Sacramento River hydrologic region or the San Joaquin River hydrologic region. The department may recognize multiple integrated regional water management plans in each of the areas allocated funding. Funds made available by this chapter shall be allocated as follows:
(1) North Coast: $36,000,000.
(2) San Francisco Bay: $105,600,000.
(3) Central Coast: $46,400,000.
(4) Los Angeles subregion: $158,400,000.
(5) Santa Ana subregion: $102,400,000.
(6) San Diego subregion: $69,600,000.
(7) Sacramento River: $60,800,000.
(8) San Joaquin River: $51,200,000.
(9) Tulare/Kern: $56,000,000.
(10) North/South Lahontan: $40,800,000.
(11) Colorado River Basin: $37,600,000.
(12) Mountain Counties Overlay: $35,200,000.
(13) Interregional: $40,000,000.
(f) Interregional funds may be expended directly or granted by the department to address multiregional needs or state priorities, including, but not limited to, any of the following:
(1) Investing in new water technology development and deployment.
(2) Meeting state water recycling and water conservation goals.
(3) Adapting to climate change impacts.
(4) Reducing contributions to climate change.
(5) Other projects to improve statewide water management systems.
(6) Other projects and activities designed to meet the needs of disadvantaged communities or economically distressed areas including technical and grant writing assistance.